We have LLA-27 block wich is already in production at 1,000 BOPD​. This year’s plans include the drilling of  two (2) A-1 Wells (FLAMI-3 & FLAMI-4), one (1) Disposal Well.

 

Llanos 27 block localization

​Two hours by road from YOPAL Casanare, in the middle of several productive fields.​

​Three wells drilled with commercial  production, (Maní-1 and Flami-1 and Flami 2).​

​Additional leads with high oil potential and additional resources of 4.0 Million barrels, including lower Sandstones (UNE), Mirador and Gacheta formations.

 

Captura de pantalla 2015-05-06 a las 14.05.23

 

Llanos 27​ Exploratory summary

Exploratory Wells drilled with production:​

  • Maní-1 (Initial test 1940 BOPD 16° API BSW: 16%). Mirador Formation well reserves 450,000 Barrels, returned to the ANH.​
  • Flami-1 (Initial test 2464 BOPD  16°API BSW: 12%) producing from Lower sandstones UNE, Mirador formation initial test 500 BOPD with BSW:75%, still close.​
  • Initial reserves calculation of 3.2 Million Barrels only in Flami

 

Captura de pantalla 2015-05-06 a las 14.06.58

 

3D Seismic DATA Integración Llanos 27 Pajaro Pinto of PRE (Faults definition)

 

 Captura de pantalla 2015-05-06 a las 14.07.06 +